Friday, August 8, 2014

August 2014 update

.
Landscaping (desert conversion) update 
The 9115 cul-de-sac conversion to desert landscaping has been completed for now.  Adding additional colorful plants will be an on-going project after all four cul-de-sacs have been converted. 

NEXT PROJECT:  92nd Street drainage
PURPOSE:  Correcting the problem of irrigation water flooding 92nd Street.   Because the ground on both sides of 92nd Street slopes downward, irrigation water naturally flows into the street. 

EXPLANATION:  The next project is creating a “dry well” along both sides of 92nd Street.  This project involves digging a trench two feet wide and one foot deep along the red curbs from Purdue Avenue to the 9460 + 9465 cul-de-sacs.    The trench will be filled in with river rock to cause a drainage collection space so that irrigation water will no longer flow out into 92nd Street.  The sprinkler system will also be refurbished. 

Please understand that the grass behind and between buildings is not being removed.  The conversion to desert landscaping involves only the fronts of the buildings surrounding the parking areas.   Village Two HOA has received written approval from both the city of Scottsdale and McCormick Ranch to proceed with theconversion of the remaining cul-de-sacs.  After the 92nd Street project, work will continue with 9465 N. 92nd Street, then 9460 N. 92nd Street, and finally 9125 E. Purdue. 

The next Village Two BOD meeting will be held 
Tuesday, September 30, 2014 at 8:30 AM
National Property Services office located at 16099 N. 82nd Street B-2, Scottsdale, AZ. 